01
NFR Construction: Rahmatpur to Bibiganj
Construction of minor bridges in connection with the new line between Araria–Galgalia.
27 bridges · 27 spans · 164.7 RM total lengthStructures, corridors and construction expertise that carry India's rail network forward.
Construction of minor bridges in connection with the new line between Araria–Galgalia.
27 bridges · 27 spans · 164.7 RM total lengthSuperstructure of steel girder, composite girder and PSC slab for major bridges.
8 bridges · 6 steel girders · 1 PSC slabIntrusion Detection System for elephant movement tracking and level crossing alerts.
1000 KM trenches · 1200 KM OFC cableAutomatic signalling and civil infrastructure delivery on the B-route of Southern Railway.
14 block sections · 22 huts · 102.74 RKM